  1. Marina excavation and fill disposal at Tarpon Cove is nearly complete
  2. Brazilian Building exterior is complete and floors have been installed
  3. Concrete cap and facings are near completion
  4. Palm Way Dock utilities are installed with power pedestals and switch cabinets placed on the docks
  5. Brazilian Dock utilities remain in progress and power pedestals and switch cabinets are being placed on the docks
  6. Australian Dock delivery is complete along with the main gangway. Power pedestals and switch cabinets installation is nearing completion
  7. Peruvian Dock deliveries are complete and the dock is being assembled
  8. Upland electrical conduit work continues
  9. Peruvian Building vertical construction is complete
  10. Lake Drive Park improvement project is well underway with sidewalks and curbing installation ongoing
  11. Paver installation for the Lake Trail and paths are nearly complete
  12. Landscape material is in the process of being installed
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation
Town of Palm Beach Marina Renovation


Share
October 15, 2024

Dock Like a Native: Nautical Know-How at the Palm Beach Marina

Read More
September 24, 2024

We’ve Sailed Away With Two Visit Florida Flagler Awards!

Read More