The multimillion-dollar renovation of the Town of Palm Beach Marina is scheduled for completion, with plans to reopen on November 1, 2021.
According to the developers, the $40 million in upgrades will transform the classic docks into a world-class yacht centre that will welcome vessels from 60ft to 294ft.
The new Town Marina will provide patrons with 84 slips, located along the classic Australian, Brazilian, and Peruvian docks, while introducing a new 250ft Royal Palm Dock. As part of the town marina renovation project, three stationary docks have been replaced with floating docks, and a fourth dock will be added at the north end of the marina. Construction commenced in May 2020.